Monolithic works
as a separate subcontract

ONEZA Construction carries out concrete works on other parties' projects: foundations of every type, columns, basement walls, slabs, stairs and complete frames — from $140 / m². Our own formwork covers 6,000 m² of slabs at once, with in-house concrete and rebar crews and our own machinery. Stage dates and quantities are fixed in the contract.

We come on site with our own engineering staff and documentation: hidden-work acts, rebar acceptance, concrete class control and strength testing at design age. If you or your client already have a technical supervisor, we work with them directly — that is our normal mode.

What you get

Why take a dedicated
concrete subcontractor?

The frame sets the schedule of the whole project: until it is closed, neither the facade nor the services can start. That is why it goes to those who have the resources to hold the pace.

Formwork we own

Enough sets for 6,000 m² of slabs at once: the cycle does not depend on a rental company freeing up a kit.

In-house crews, not casual labour

Concrete and rebar crews on staff — 120 people. The team on your site does not change from week to week.

Documentation as built

Hidden-work acts, rebar layouts, concreting logs and strength reports, in the form your supervisor will accept.

A cycle you can schedule

The slab cycle is calculated in advance and fixed by stages, so you plan the facade and the services from a real date, not a promise.

What usually goes wrong

Why developers replace
their concrete subcontractor

Four typical reasons a previous subcontractor is dismissed. We remove them by how the work is organised, not by promises.

  1. 01
    “The geometry drifted and the windows no longer fit”

    Axes and levels are set out instrumentally and checked before every pour, with the formwork levelled by instrument. Deviations are recorded by act, not discovered at facade stage.

  2. 02
    “Concrete of unclear class”

    Concrete is accepted against plant documents with samples taken; strength reports at design age are handed to the client together with the acts.

  3. 03
    “The crew vanished in high season”

    People and machinery are on our own payroll and balance sheet. The site does not stop because a crew left for a better-paying job.

  4. 04
    “No paperwork, so the supervisor will not sign off”

    Documentation is kept as the work proceeds, not assembled retroactively before acceptance.

Parameters

Which works
do we take on?

ParameterValue
FoundationsRaft, strip, piled with pile caps
StructureColumns, basement walls, slabs, stairs, complete frames
ProjectsResidential buildings, industrial buildings, private houses
ResourcesOwn machinery and formwork for 6,000 m² of slabs at once
ControlHidden-work acts, rebar acceptance, concrete control
ResultA structure delivered with as-built documentation
Foundations and monolithic works

Contractor questions

What do developers
ask us?

What do monolithic works cost?

2026 guide: from $140 / m² for the frame. The exact price depends on the complexity of the joints, the density of reinforcement, the height and how tight the site is, and is calculated from your drawings.

Do you work to someone else's design?

Yes, that is the main format for a subcontract. Before starting, our structural engineer checks the drawings for buildability and reports discrepancies before they become a site problem.

Who accepts the hidden works?

Acceptance is done by the technical supervisor — yours, the client's or an independent one. We prepare the acts, layouts and reports and never close works without a signature.

Do you take projects outside Tbilisi?

Yes, we work across Georgia. Formwork and machinery logistics are a separate line in the estimate so the mobilisation cost is visible in advance.

Our commitment

Will the price change
during construction?

We fix
the full scope

The complete estimate, handover date, scope of works, materials and specific brands.

We back it
with resources

Our own plant, formwork and crews. Direct supply and a detailed design before we start.

Changes —
transparent

If the brief changes, we price only the difference and agree it before work begins.

How the fixed price works

Next step

Let us price
your frame

Send the drawings or the quantities by stage — we reply within one working hour with a price per m² and a cycle time.

+995 599 538 277WhatsApp · Telegram

  1. 01Brief
  2. 02Design
  3. 03Estimate
  4. 04Lock-in

Two fields — and we'll get back to you within one working hour

By clicking the button you agree to our privacy policy.

Get an estimate